I learned about this “pre-tensioning” of concrete in a physics class (a long time ago), and the professor noted that it had been used on all the sections of Miami’s metrorail, which are long concrete sections like the bridge.
I wonder why they put it into place incomplete. And didn’t one of the engineers actually report a crack in the bridge earlier in the day before it collapsed?