Dock repair update: This has turned into a full-on project. The heavy-duty hot-dip-galvanized hardware had some corrosion, so I’m de-rusting and then re-galvanizing.
Power-washed all the algae and crud off the float tanks. One of the six tanks was full of water and will have to be replaced.
All that’s left at the lake is the anchor and a stack of deck boards.